Reduced-Order Modelling of Concentrated-Leak Internal Erosion in the Former Zoungou Dam Embankment (Ganzourgou, Burkina Faso): Pipe Growth and Breach-Time Assessment
Mady Sawadogo1*, Ulrich Landry Compaoré2, Justin Tegawendé Zaïda2 and David Yemboini Kader Toguyeni2
1Université Joseph KI-ZERBO, Ouagadougou, Burkina Faso
2École Polytechnique de Ouagadougou, Ouagadougou, Burkina Faso
*Corresponding author
Abstract:

Concentrated leak internal erosion is one of the main failure mechanisms affecting earth-fill dams. This study implements, in COMSOL Multiphysics, the reduced-order piping erosion model proposed by Bonelli et al., (2007) and extended by Lachouette and Bonelli (2008), and applies it to the former breached embankment of the Zoungou Dam, located in Ganzourgou Province, Burkina Faso. The model is formulated as a system of three coupled global ordinary differential equations which describes the evolution of the erosion pipe radius R(t), the upstream reservoir level Hamont(t), and the cumulative volume of eroded material Volérodé(t). The embankment material was characterized by geotechnical identification tests, especially, sieving analysis, sedimentometry and Atterberg limits. Pending Hole Erosion Tests (HET),, the direct reference method for determining the critical erosion stress τc and the erosion coefficient Ker, these parameters were estimated from empirical correlations based on the plasticity index, fines content, and dry density of the material. The reference scenario, applied to the 6.5 m high structure with an initial defect of 10 cm in radius, results in a failure time of 5.24 hours for a total eroded volume of 994.47 m3. The numerical solution is verified by comparison with an analytical solution based on a constant hydraulic load, with a discrepancy of less than 2.1%. A univariate sensitivity analysis of six parameters (τc, ker, R0, Rmax, Haval and λf) shows that the failure time is dominated by the erosion coefficient ker and the hydraulic load, while the critical stress τc has only a negligible influence under these conditions.

Keywords: Earth dam, internal erosion, erosion model, COMSOL Multiphysics, embankment dam failure.
Download this article as Download

How to cite this article:

Mady Sawadogo, Ulrich Landry Compaoré, Justin Tegawendé Zaïda and David Yemboini Kader Toguyeni. 2026. Reduced-Order Modelling of Concentrated-Leak Internal Erosion in the Former Zoungou Dam Embankment (Ganzourgou, Burkina Faso): Pipe Growth and Breach-Time AssessmentInt.J.Curr.Res.Aca.Rev. 14(11): 101-116
doi: https://doi.org/10.20546/ijcrar.2026.1411.012